Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 62 Current »

Find Dates

The following a list of suggestions of weeks for the Interop. Typically an InterOp will take place in spring or in fall. The finally selected Week has to be marked by a green background.

We should aim for an earlier interop to be as far away from drupa as is reasonable.

WeekTradeshow notesHoliday notes
 March 11-15
selected week

InterOp Registration


Focus Topics


Issues for Discussion

We will discuss all JIRA issues which are labeled with InterOp-44. The goal is to resolve the issues although not necessarily words mything to the final dotted i and crossed t.

type key summary status
Loading...
Refresh


Attendee
Representing

Attend in-person

/

Date of ArrivalDate of Departure

Will attend Social Event?

/

Chris Heric
Wyska(tick)March 10March 16(tick)
Henny van Esch
Optimus(tick)March 10March 16(tick)
Matthias Heinz
ctrl-s(tick)March 11March 13(tick)
Rainer Prosi
Heidelberg(tick)March 10March 16(tick)
Jochen Günther
Jochen Günther(tick)March 10March 16

Nick Bourne
Imprint MIS

Ron van Duin
Dataline(tick)March 10March 14
Thomas Hoffmann-Walbeck

(tick)March 14March 15

Sylvain Aufrere


eProductivity Software - Pace(tick)March 10March 14(tick)
Roy Woosey
eProductivity Software - Tharstern(tick)March 11March 14(tick)
Abdennaby Ayyari





Nils Heidorn
SOFHA GmbH(tick)March 10March 13
Jacek Bochnia
SOFHA GmbH(tick)March 10March 13
Dennis Carney
Ricoh

March 9March 16(tick)
Stephan Richter
Heidelberg(tick)March 10March 15(tick)
Tobias Kilches
Printplus AG(tick)March 11March 12
Graham Mann
TBP Ltd(tick)March 12March 15

Koen Van de Poel
Prepress Automation(tick)March 13March 15

Adrian Sima
Canon Production Printing(tick)March 10March 15(tick)
Roxana Davidescu
Canon Production Printing(tick)March 10March 15(tick)

Marc Gantenberg


Koenig & Bauer(tick)March 12March 14

(tick)

Anselm Scherl
Verbandplus(tick)March 13March 15(tick)
Chris Wasche
Koenig & Bauer(tick)March 12March 14(tick)
Heiko Angermann
Hochschule Darmstadt(tick)March 11March 13

(12+13 March: Seminar)
(tick)
Gilbert Leong
Xerox

Hosted by




HostFogra
DateMarch 11-15 2024
Contact Person
Email
Phone




Meeting Details
Table of Contents





Checklist
  • Find a host - The host has to be found (@TSC)
  • Select a week - Select a week for the CIP4 InterOp (@TSC)
  • Define Topics - Define main topics discussed within the InterOp (@TSC/WG members)
  • Meeting Rooms - Find meeting rooms PLUS Equipment (@Host)
  • Meeting Room Equipment - e. g. Internet Access, Beamer, Printer etc (@Host) 
  • Organize a Hotel - Organization of a hotel close the the meeting rooms (@Host)
  • Social Event - Organization of the traditional Wednesday Evening Social Event (@Host)
  • Promote InterOp - Write a mail to all CIP4 Members (@CIP4 Secretariat)
  • Photos - Take photos and upload to Confluence




Meeting Room

Name

Fogra

AddressEinsteinring 1a, 85609 Aschheim
Contact


Website
Notes
Location


Link to Connectivity Page: /wiki/spaces/TI/pages/1457553916

Time Table

If any time remains, it will be filled by walking through more Jira issues.


TimeRoom 1Room 2Room 3
Monday09:00 - 09:30Interop Setup

09:30 - 18:00Interop / Testing

Tuesday09:00 - 18:00Interop / Testing

Wednesday09:00 - 11:00Interop / Testing

11:05 - 12:00 Interop / Testing

12:00 - 12:45Lunch

12:45 - 13:15

Prepress issues

13:15 - 13:50

MIS CP ICSs

13:55-14:55

ICS and spec philosophy and next steps

  • JDF
  • XJDF
  • PrintTalk


14:50 - 15:00

Break
15:00Shut down laptops
15:30 - 16:00take train to Marienplatz - the train leaves at 15:30 and arrives 15:44 (hopefully)
16:00 - 18:30Guided tour
18:30 -  20:00
head back to restaurant / stop for a beer.
20:00Dinner
Thursday09:00 - 10:00

open spec and ics issues



10:00 - 10:55

open spec and ics issues



10:55 - 11:05

Break

11:05 - 12:00

open spec and ics issues

12:00 - 13:00

Lunch

13:00 - 14:00

open spec and ics issues



14:00 - 14:55

open spec and ics issues



14:55 - 15:05

Break

15:05 - 16:45

open spec and ics issues

17:00 - 18:30

Advisory Board meeting (AB members only)

Friday09:00 - 09:55 open spec and ics issues

10:00 - 11:00

open spec and ics issues

11:00 - 11:55

open spec and ics issues



11:55 - 13:30

Break

13:30 - 16:00

open spec and ics issues


Hotel Recommendations

Name

NH München Ost Conference Center

Address

Einsteinring 20, 85609 Aschheim

Booking Site

https://www.nh-hotels.com/en/event/cip4-2024

Website

https://www.nh-hotels.com/en/hotel/nh-muenchen-ost-conference-center

Mail


Notes

Use the booking site above for the negotiated CIP4 rate. If you find a better rate elsewhere, feel free to book there - CIP4 has no contractual obligations.
The rate is available until March 4.

Location

The hotel is in easy walking distance from Fogra and 10 minutes walk from the Riem S-Bahn station (S2)


Transportation

To Fogra

5 Minute walk from the hotel.

To hotel

By car: Ask google or apple...

By air

Munich airport () and then

  to hotel: train (fastest) or airport bus to 

  to Fogra: train to  station and then taxi or bus


Tickets public transportation


Weather

Typically around 17 degrees with showers.




Evening Social event


We will be taking a guided tour through Munich wher we will visit the sites of the early rise of Hitler. see:
https://munichwalktours.de/en/tours/group-third-reich-tour-hitlers-munich/


  • No labels